Automation of Largest Flour Mill in U.S.
|
|
Responsible for the Power Distribution Design, Lighting, Electrical Controls, Systems Integration and PLC/HMI Programming. The system is almost completely paperless and fully integrated with the Business Information Systems. |
|
|
Batching, Weighing, Blending systems with closed loop controls as well as discrete controls. |
|
|
Multiple capital projects ranging in size from $1,500 to $4 MM. Worked with customer over a 10 year period. |
|
|
Utility: 69 KV, 5 MVA capacity with 6.9 KV underground distribution. |
Industrial Coffee Roasters
installed at Largest Coffee Producers in U.S.
|
|
Partnered with German builder of batch coffee roasters. |
|
|
Up to 600 Lb. batches, 10,000 lbs. |
|
|
Heavy in Process Controls such as closed loop controls for burners, dampers, variable frequency drives. |
|
|
ControlLogix5000 PLC or PLC 5/40 with Wonderware InTouch or Rockwell Software RSView32 HMI. |
|
|
Responsible for building the PLC Control Panels and HMI Panels and supplying all controls equipment. |
|
|
Each roaster costs aproximately: $ 1 MM. Commissioned 11 roasters at the major coffee producers in the U.S. |
50,000 S.F. Warehouse (Frozen Distribution)
|
|
Responsible for the Power Distribution Design, Lighting, Fire Detection/Suppression, Security. |
|
|
Integrated various building automation systems. |
|
|
$10 MM project. |
|
|
Utility: 15 KV underground distribution. |
Residential Sewage Pumping Station
|
|
Responsible for the Power Distribution Design, vendor coordination, specifications and overall integration. |
|
|
$25,000 Electrical Engineering Fee. |
|
|
Utility: 480 volt underground. |
Various Electrical Construction Cost Estimates
|
|
Responsible for electrical cost estimates for new facilities and upgrades to existing. |
|
|
Utilize RSMeans Estimating Spreadsheets. |
|
|
Construction projects range from $50,000 up through $20 MM. |
|
|
Utility: 480 volt underground. |